We’re moving in on August 20th, no ifs, ands, or buts. Sometimes you just have to draw a line in the sand.
The line, the hurdle we have to get over, is the floors being refinished. After that we can move our stuff in, even if we have no functioning kitchen and have to use the upstairs bathroom with the phone booth shower. The floor refinishing is scheduled to start late this week or Monday, the 11th at the latest. All of the downstairs except the bathroom is oak hardwood.
Will continue this post later. I have to go paint a cabinet today.